Infrastructure
Project Name: E8Q79 Turnpike Mainline Widening
Project Location: Palm Beach County, Florida
Project Description: The improvements under this consist of widening of approximately 7.6 miles of Turnpike mainline from 4 and 6 lanes to 8 lanes from north of SR 804 (Boynton Beach Boulevard) (milepost 87.1) to north of SR 802 (Lake Worth Road) (milepost 94.7). The typical section consists of one express lane and 3 general tolled lanes in each direction. This project proposes to realign the mainline centerline to the west to prevent the proposed improvements from encroaching into the Florida Gas Transmission (FGT) facility specified width and mitigate the risk of possible triggering events. This project also includes the construction of the mainline AET toll facilities and partial reconstruction of the existing Lantana Toll Plaza to accommodate six through lanes, with the remainder of ticket lanes (4 in each direction) to remain in operation. The project cost approximately $168 million.
Client: Johnson Bros. Southland Holdings LLC
Service Provided: Material Testing/Quality Control Services, Vibration Monitoring Services and Pre & Post Construction Survey.
Project Name: PBIA Northeast Airfield Improvements (Palm Beach International Airport)
Project Location: Palm Beach County, Florida
Project Description: The improvements under this contract consist of, 7,900 feet of parallel taxiway, runway-apron connectors, and a full-length rehabilitation of the Runway 14-32 shoulders, removal and construction of airfield drainage system structures, pipe and box culvert; removal and construction of water main; removal and construction of asphalt taxiway pavement, including milling; removal and construction of concrete apron pavement; installation of aircraft grounding system in apron pavement; temporary and permanent pavement marking; removal and construction of high mast apron lighting; removal and construction of airfield lighting, signage, conduit and cable systems; revision of airfield lighting control panel graphics; and related maintenance of traffic requirements. The project cost approximately $25 million.
Client: Ranger Construction Industries, Inc.
Service Provided: Material Testing/Quality Control Services.
Project Name: SR A1A North Causeway Over Intracoastal
Project Location: Port St. Lucie, Florida
Project Description: The project improvements consist of constructing a new high-level fixed bridge connected directly to SR-5/US-1 going over the Florida East Coast (FEC) Railroad, Old Dixie Highway, and the Intracoastal Waterway (ICWW) featuring: one 12-foot travel lane in each direction, navigational clearances of 85 feet vertical and 125 feet horizontal at the waterway channel; installing a barrier-protected 8-foot sidewalk on the south side of the bridge and a barrier- protected 12-foot shared use path on the north side of the bridge; installing 7-foot buffered bicycle lanes within the shoulders on both sides of SR-A1A; constructing a 12-foot shared-use path along Old Dixie Highway to provide connectivity to the East Coast Greenway; building an observation deck beneath the west side of the new bridge structure; constructing a new access road under the bridge to businesses east of the FEC Railroad; extending Juanita Avenue from SR-5/US-1 to Old Dixie Highway; and connecting SR-5/US-1 and Old Dixie Highway along Sunny Lane.
Client: Vecellio & Grogan, Inc.
Service Provided: Material Testing/Quality Control Services, Vibration Monitoring Services and Pre & Post Construction Survey.
Project Name: Underline Phase 2
Project Location: Miami, Florida
Project Description: Phase 2 of The Underline is a 2.14-mile segment that connects SW 13th St. to SW 19th Ave. Construction began Fall 2021 and is expected to be completed by the end of 2023. Phase 2 is built on three key drivers: safe multi-modal transportation, nature, and community. After many presentations, public meetings, surveys, and community feedback, two of the main public priorities are: Safety: safe biking and walking paths, lighting and improved crosswalks; Nature: native vegetation including trees, plants and grasses that support The Underline master plan restoration of the Pine Rockland, Hardwood Hammock, Pollinator and Wet Prairie ecosystems. Part of pre-construction efforts include the removal and relocation of trees along the Phase 2 segment. In preparation for this work, informational tags with QR codes are on trees that are being relocated and removed. Trees that are remaining are protected by orange fencing.
Client: LEAD Engineering Contractors
Service Provided: Material Testing/Quality Control Services, Vibration Monitoring Services and Pre & Post Construction Survey.
Project Name: C-139 Flow Equalization 3 – G551
Project Location: Clewiston, Florida
Project Description: This project includes a 11,000-acre shallow reservoir that will store local basin runoff from the C-139 Basin and control the flow of water to the adjacent Stormwater Treatment Area 5/6. This will help improve the performance of STA 5/6, removing nutrients from stormwater and improving the quality of the water before it flows south to Everglades National Park. A priority Everglades project, the South Florida Water Management District is accelerating this project to bring the Flow Equalization Basin online as quickly as possible. The project is expected to be complete during the summer of 2023.
Client: Condotte Ryan JV
Service Provided: Geotechnical Engineering, Environmental Consulting, Material Testing/Quality Control Services, Vibration Monitoring Services and Pre & Post Construction Survey.
Project Name: Westport Wastewater Treatment Facility Expansion – Phase I
Project Location: Port Saint Lucie, Florida
Project Description: The proposed project consist of the improvements to the existing aeration basins and aeration basin effluent piping, improvements to the clarifier sludge piping, the addition of two (2) plant drain pump stations, improvements to the plant drain gravity and force main systems, improvements to the reclaimed water chlorine contact chamber overflow system, improvements to the plant reuse water system and filter modifications.
Client: TLC Diversified Inc.
Service Provided: Material Testing/Quality Control Services.