Project Name: E8Q79 Turnpike Mainline Widening

Project Location: Palm Beach County, Florida

Project Description: The improvements under this consist of widening of approximately 7.6 miles of Turnpike mainline from 4 and 6 lanes to 8 lanes from north of SR 804 (Boynton Beach Boulevard) (milepost 87.1) to north of SR 802 (Lake Worth Road) (milepost 94.7). The typical section consists of one express lane and 3 general tolled lanes in each direction. This project proposes to realign the mainline centerline to the west to prevent the proposed improvements from encroaching into the Florida Gas Transmission (FGT) facility specified width and mitigate the risk of possible triggering events. This project also includes the construction of the mainline AET toll facilities and partial reconstruction of the existing Lantana Toll Plaza to accommodate six through lanes, with the remainder of ticket lanes (4 in each direction) to remain in operation. The project cost approximately $168 million.

Client: Johnson Bros. Southland Holdings LLC

Service Provided: Material Testing/Quality Control Services, Vibration Monitoring Services and Pre & Post Construction Survey.

Project Name: PBIA Northeast Airfield Improvements (Palm Beach International Airport)

Project Location: Palm Beach County, Florida

Project Description: The improvements under this contract consist of, 7,900 feet of parallel taxiway, runway-apron connectors, and a full-length rehabilitation of the Runway 14-32 shoulders, removal and construction of airfield drainage system structures, pipe and box culvert; removal and construction of water main; removal and construction of asphalt taxiway pavement, including milling; removal and construction of concrete apron pavement; installation of aircraft grounding system in apron pavement; temporary and permanent pavement marking; removal and construction of high mast apron lighting; removal and construction of airfield lighting, signage, conduit and cable systems; revision of airfield lighting control panel graphics; and related maintenance of traffic requirements. The project cost approximately $25 million. 

Client: Ranger Construction Industries, Inc.

Service Provided: Material Testing/Quality Control Services.

Project Name: E4T09 – SR-76 (Kanner Highway) Widening 

Project Location: Martin County, Florida

Project Description: The improvements on this project include: reconstructing Kanner Highway from CR 711 to Locks Road from a two-lane undivided highway to a four-lane divided highway with a raised median and curb & gutter; adding seven-foot-wide bicycle lanes from CR 711 to Locks Road; adding a 12-foot-wide shared use path on the east side of Kanner Highway from CR 711 to Locks Road; adding a six-foot-wide sidewalk on the west side of Kanner Highway from CR 711 to Locks Road; installing drainage features that will improve drainage; and resurfacing Kanner Highway from Locks Road to SW Jack James Drive. Access points and turn lanes will be provided throughout the corridor at the following locations: there will be turn lanes at the two signalized intersections CR 711 and Locks Road; full median openings will be at Mary Drive, Tropical Avenue, and SW Old Royal Drive; and a left-turn-only median opening will be located at Beverly Terrace. Estimated Construction Cost of $ 12,892,088.57

Client: Ranger Construction Industries, Inc.

Service Provided: Material Testing/Quality Control Services, Vibration Monitoring Services and Pre & Post Construction Survey.

Project Name: E8Q65 – Turnpike AET – PH 8 – Ticket System

Project Location: Mile Marker 88 to 236: Palm Beach County to Orange County/Orlando, Florida

Project Description: The improvements on this project includes conversion of Turnpike Mainline from milepost 88 to milepost 236 to All Electronic Tolling (AET) by constructing new AET gantries on the mainline and removing the existing mainline toll plazas as well as the existing toll plazas on the interchange ramps. The project scope of work also includes the addition of several new Dynamic Message Signs (DMSs) and the replacement of some existing DMSs including Travel Time System (TTS) devices at DMS locations, and DMS verification CCTV. Estimated Construction Cost of $120 Million.

Client: Traffic Management Solutions, Inc. (TMS)

Service Provided: Quality Control Services

 

Project Name: E4T51 – NW 136th Ave @ SR-84, SIS Facility Improvements

Project Location: Broward County, Florida

Project Description: The improvements under this contract consist of NW 136th Avenue at SR 84 Intersection Improvements in Broward County. Estimated Construction Cost of $6.5 Million.

Client: LEAD Engineering Contractors

Service Provided: Material Testing/Quality Control Services, Vibration Monitoring Services and Pre & Post Construction Survey.

Project Name: Westport Wastewater Treatment Facility Expansion – Phase I

Project Location: Port Saint Lucie, Florida

Project Description: The proposed project consist of the improvements to the existing aeration basins and aeration basin effluent piping, improvements to the clarifier sludge piping, the addition of two (2) plant drain pump stations, improvements to the plant drain gravity and force main systems, improvements to the reclaimed water chlorine contact chamber overflow system, improvements to the plant reuse water system and filter modifications.

Client: TLC Diversified Inc.

Service Provided: Material Testing/Quality Control Services